Need help with this please: Creating a System Build Project, in which you will be required to design an information system for an organization of your choosing: possibly a current or past employer, or even a fictitious organization
MGT321 System Build Project Rubric
Criteria 3=Superior 2=Average 1=Developing 0=Unacceptable Weight Score
Determine the system (needs analysis) • Develop and produce a needs analysis by identifying the problem to solve
• Explain the specific issue of concern for the organization
• Justify the role technology will play to solving the issue
• Explain the input obtained from creators and user and the process to obtaining information
• Integrate how the solution to this issue supports the organization’s mission Missing one of the required elements Missing two of the required elements Missing more than three of the required elements x10
System Integration (explain how this system integrates into the current systems in the organization) • Describe current major systems that will need to interact with this system
• Address any compatibility issues with current major systems
• Explore and report on various decision-making support models considered or currently used
• Explain the advantages as well as any limitation of data used in the decision-making models of this organization
• Explore different implementation processes and comment on a preferred method for implementing your process
• Reveal any security issues and the steps taken to alleviate any concerns
• At least four of the required system integration issues were presented in the paper.
• At least three of the required system integration issues were presented in the paper.
• Less than three of the required system integration issues were presented in the paper. x10
Criteria 3=Superior 2=Average 1=Developing 0=Unacceptable Weight Score
Feasibility • Analyze and explain what went into the hardware needs and final selections
• Analyze and explain what went into the software needs and final selections
• Demonstrate an understanding of the system maintenance (i.e. repair, upgrades, obsolescence, and technology changes)
• Develop a final cost analysis for the project (includes both upfront costs and total cost of ownership)
• Comment on the organizational culture related to technology changes and the successes of lack thereof of previous technology changes Missing one of the required elements Missing two of the required elements Missing more than two of the required elements x10
Measurement • Identify how the success or failure of the project will be measured
• Explain what efficiencies will be created by the implementation of this system
• Determine the “ROI” on the initial cost outlay and examine cost savings from the efficiencies Missing one of the required elements Missing two of the required elements Missing more than two of the required elements x10